2020 Trail Improvements
We have made substantial improvements to a number of trails throughout the Village over the past several months. The standard width for several trails has been increased, which is conveniently providing physical distancing space, and trail drainage has been improved to prevent future water damage. More details on the various trail renovations can be found below.
Michael Rosen Trail
- Widened and resurfaced the trail to make it more accessible
- Installed a picnic table
- Cleared away brush to widen up the park area
Pinnacle Trail
- Widened and resurfaced the trail to make it more accessible
- Cleaned up drainage to prevent water damage on the trail
- Cleared away brush and opened up the entrance to the trail
Ravenswood to Elementary Street
- Widened and resurfaced the trail to make it more accessible – the trail is now ideal for strollers
- Cleared away brush to provide more open space along the trail
Trail at Thompson
- Widened the trail by cutting back brush
Spirit Park Entrance
- Installed stairs to provide a new access point to Spirit Park
- Cleared away bramble and weeds
- Added top-soil and grass to entry area
